Arshad, M F, Thaheem, M J, Nasir, A R and Malik, M S A (2019) Contractual Risks of Building Information Modeling: Toward a Standardized Legal Framework for Design-Bid-Build Projects. Journal of Construction Engineering and Management, 145(04).

Baek, M and Ashuri, B (2019) Analysis of the Variability of Submitted Unit Price Bids for Asphalt Line Items in Highway Projects. Journal of Construction Engineering and Management, 145(04).

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001638
  • Abstract:
    Highway construction costs are subject to significant variations from project to project and over time. Variations in construction cost disrupt transportation agencies in making right investment decisions and estimating accurate construction costs for projects. A wide range of variables has been proposed in different studies to explain variations in construction cost. There is value in conducting a research study that attempts to consider a comprehensive list of variables with potentials to explain the variations. The study needs to simultaneously take into account all possible explanatory variables to examine their relations with construction costs. The objective of this research is to assess the relations of several potential variables to explain variations in submitted unit price bids for major asphalt line items in highway projects. The primary contribution of this paper to the body of knowledge is the creation of a random parameters model to explain variations in submitted unit price bids for asphalt line items in highway projects. The identified variables used to build the random parameters model were classified into two major tiers. Tier 1 represents project-specific categories, including project characteristics, major supply sources for critical materials, and price adjustment clauses. Tier 2 represents global and external categories, consisting of the level of activities in local highway construction market, construction market conditions, macroeconomic conditions, and energy market conditions. It is expected that the findings of this paper will contribute to the current practice of cost estimation and investment decision making by helping transportation agencies develop more accurate budgets and contractors prepare more accurate bids for highway projects.

Chao, L and Liaw, S (2019) Fuzzy Logic Model for Determining Minimum Overheads-Cum-Markup Rate. Journal of Construction Engineering and Management, 145(04).

Deng, Y, Gan, V J L, Das, M, Cheng, J C P and Anumba, C (2019) Integrating 4D BIM and GIS for Construction Supply Chain Management. Journal of Construction Engineering and Management, 145(04).

Hacker, M E, Kaminsky, J and Faust, K M (2019) Legitimizing Involvement in Emergency Accommodations: Water and Wastewater Utility Perspectives. Journal of Construction Engineering and Management, 145(04).

Jin, R and Chen, Q (2019) Overview of Concrete Recycling Legislation and Practice in the United States. Journal of Construction Engineering and Management, 145(04).

Kereri, J O and Harper, C M (2019) Social Networks and Construction Teams: Literature Review. Journal of Construction Engineering and Management, 145(04).

Kim, J, Ham, Y, Chung, Y and Chi, S (2019) Systematic Camera Placement Framework for Operation-Level Visual Monitoring on Construction Jobsites. Journal of Construction Engineering and Management, 145(04).

Li, H, Wang, M and Dong, X (2019) Resource Leveling in Projects with Stochastic Minimum Time Lags. Journal of Construction Engineering and Management, 145(04).

Li, Y, Li, G, Wang, T, Zhu, Y and Li, X (2019) Semicustomized Design Framework of Container Accommodation for Migrant Construction Workers. Journal of Construction Engineering and Management, 145(04).

Mitikie, B B and Lee, T S (2019) Experimental Investigation of Enzyme Stabilization and Its Effect on Clay Brick. Journal of Construction Engineering and Management, 145(04).

Nasirian, A, Arashpour, M, Abbasi, B and Akbarnezhad, A (2019) Optimal Work Assignment to Multiskilled Resources in Prefabricated Construction. Journal of Construction Engineering and Management, 145(04).

Noorizadeh, A, Peltokorpi, A and Avkiran, N K (2019) Supplier Performance Evaluation in Construction Projects: Challenges and Possible Solutions. Journal of Construction Engineering and Management, 145(04).

O’Connor, J T and Mock, B D (2019) Construction, Commissioning, and Startup Execution: Problematic Activities on Capital Projects. Journal of Construction Engineering and Management, 145(04).

Oswald, D, Wade, F, Sherratt, F and Smith, S D (2019) Communicating Health and Safety on a Multinational Construction Project: Challenges and Strategies. Journal of Construction Engineering and Management, 145(04).

Son, J, Khwaja, N and Milligan, D S (2019) Planning-Phase Estimation of Construction Time for a Large Portfolio of Highway Projects. Journal of Construction Engineering and Management, 145(04).

Wu, L, Jia, G and Mackhaphonh, N (2019) Case Study on Improving the Effectiveness of Public Participation in Public Infrastructure Megaprojects. Journal of Construction Engineering and Management, 145(04).

Xiong, B, Skitmore, M, Xia, P, Ballesteros-Pérez, P, Ye, K and Zhang, X (2019) Impact of Corporate Credit Scoring on Construction Contractors in China. Journal of Construction Engineering and Management, 145(04).